Jack Daulton in foreground reviewing progress. Jack has played an important part in the building of his house. Ideas are often batted around in an attempt to land in the best possible place for the overall vision. Design should never be limited to the drawing table, but treated as an evolving element that can be learned about as a project progresses. 100% scale reveals the true strengths and weaknesses of a concept. This often causes a direction to be modified, or even redefined, during the building process. This can be referred to as, "listening to what the structure has to say." In a manner of speaking, a building will tell you what it needs. If you know the language, and how to listen for it, both the edifice and the minds involved will move forward in a positive way.
Friday, September 24, 2010
Radius Roof Lines
Jack Daulton in foreground reviewing progress. Jack has played an important part in the building of his house. Ideas are often batted around in an attempt to land in the best possible place for the overall vision. Design should never be limited to the drawing table, but treated as an evolving element that can be learned about as a project progresses. 100% scale reveals the true strengths and weaknesses of a concept. This often causes a direction to be modified, or even redefined, during the building process. This can be referred to as, "listening to what the structure has to say." In a manner of speaking, a building will tell you what it needs. If you know the language, and how to listen for it, both the edifice and the minds involved will move forward in a positive way.
Tuesday, September 21, 2010
Rafters
Rafters have been oversized and placed on 12" cntrs to support the slate roof load. Additionally, 3/4" plywood decks the roof's substrate.
Abell and his apprentice fastening sill along structural masonry radius rake. Note radius rafters of shed roof dormer in back ground. This subtle design inflection provides support to the dominant asymmetrical roof sweep of the front porch gable. The Daulton design provides an opportunity for masonry and carpentry to be applied in such a way as to celebrate the fuller potential of discipline and craftsmanship.
Main cross gable established. This portion of the roof encloses the clerestory atrium, formal living room and library upstairs.
Back of house. Existing masonry portion will serve as an open back porch with exterior fireplace.
Thursday, September 9, 2010
Stability Engineering
Field visit with Pierre Coiron and Allen Morris of Stability Engineering. Pierre and Allen were on site today to access future structural steel applications.
Wednesday, September 8, 2010
Saturday, September 4, 2010
Decking Main Level Floor System
The floor system was completed today. A great deal of attention was given to the installation — any latent mistakes in the main floor will transfer exponentially to the rest of the frame. Tolerances were set at 1/8." T and G, High Performance, Advantech flooring decks the substrate. This is an extremely durable and water resistant material. Dave Lee with "i Level by Weyerhaeuser" provided the i joist floor system framing. Dave lives locally in Oakhurst and has been instrumental to the process.
Friday, September 3, 2010
Commence Framing

Framing began today. The four stand alone masonry structures will be brought together by the frame as the Daulton house begins to take shape. Along the way, speculations have been raised by onlookers as to what is actually being constructed at 318 South McDonough Street; from memorial, to chapel, to expansion of the Agnes Scott campus. For those confused by the departure from conventional building orthodoxy, it's all about to make sense. It's a point of particular note to mention that the structural masonry elements of the Daulton House represent centuries of Architectural process and expression. Daily, we receive support for the vision and craftsmanship of the project and for this we are always appreciative. As a resident of the City of Decatur Community, it's important to me that the project is a success both for the Daulton's and MAK neighborhood.
Tuesday, August 31, 2010
Front Chimney Completed
A milestone for the hybrid building process, finishing the second chimney marks the completion of the structural masonry aspect of the Daulton House and the beginning of the conventional construction phase.
Saturday, August 28, 2010
Chattahoochee
Floating the Chattahoochee with family and friends. 3 hours between Powers Landing and Paces Ferry. We've made three different trips down the river this summer with 4 year old and 1 year old in tow. Jeff Craven took this shot of me doing a back layout off one of the cliffs along the river. The camera is one of the more recent Sony Cyber Shots —14 Mpx with 10x optical zoom, and a burst mode that takes several images back to back as you hold the shutter button down.
Monday, August 23, 2010
Tuesday, August 10, 2010
Sunday, August 8, 2010
Friday, August 6, 2010
Topping Out First Chimney
Mason Benito beginning the herringbone firebrick pattern in the formal fireplace hosted by the Living and Dining Rooms. This fireplace will have the cast stone mantel face with decorative metal slip featured in an earlier post (May 11th, 2010).
Wednesday, August 4, 2010
Raising First Chimney
Tuesday, August 3, 2010
Beginning Living Room Fireplace
Sunday, August 1, 2010
Grist Mill Ruins/Athens, GA
Remnants of a grist mill damn flanking side of stream.
While walking with my family along a creek close to Faust Farm Rd. in Crawford (just outside of Athens, GA), we came across the ruins of what appeared to be a grist mill. The stack stone foundation and damn were both made up of massive blocks that must have been hoisted into place using a primitive crane similar to a gin pole by my best guess. The damn was a hundred yards or so upstream and the topography between the two structures revealed the flume run. Though I have no expertise in this area, I believe this was a pre-civil war operation. It appears to now be on private property — there is no marker or sign indicting historical management. I have contacted the Athens Historical Society (AHS) to see what might be on record.
Tuesday, July 27, 2010
Friday, July 16, 2010
Saturday, July 10, 2010
Building Fireplaces
To be cont...
Monday, July 5, 2010
Friday, June 18, 2010
Completed Front Portico
Raising the masonry porches prior to framing has generated a lot of interest in the community and deserves some explanation. I should start by saying these are 12 inch thick structural masonry walls that are load bearing to other elements of the building, as opposed to veneer masonry which does not support any part of the structure other than itself. Because this very traditional method of building is quite time consuming, it's important to execute prior to conventional stages of the process, i.e. framing. Once framing begins ridge beams, rafters and floor systems can be connected, and the masonry becomes an integral part of the general super structure. Additionally, the four fireplaces and two structural chimneys will be built prior to framing. Veneer masonry will clad the frame.
Subscribe to:
Posts (Atom)