Saturday, September 4, 2010

Decking Main Level Floor System









The floor system was completed today.  A great deal of attention was given to the installation — any latent mistakes in the main floor will transfer exponentially to the rest of the frame.  Tolerances were set at 1/8." T and G, High Performance, Advantech flooring decks the substrate.  This is an extremely durable and water resistant material. Dave Lee with "i Level by Weyerhaeuser" provided the i joist floor system framing. Dave lives locally in Oakhurst and has been instrumental to the process.

No comments:

Post a Comment