The floor system was completed today. A great deal of attention was given to the installation — any latent mistakes in the main floor will transfer exponentially to the rest of the frame. Tolerances were set at 1/8." T and G, High Performance, Advantech flooring decks the substrate. This is an extremely durable and water resistant material. Dave Lee with "i Level by Weyerhaeuser" provided the i joist floor system framing. Dave lives locally in Oakhurst and has been instrumental to the process.
No comments:
Post a Comment